This project comprised of flat roof coverings throughout the school being replaced. The majority were converted to partial warm roof construction with a single ply membrane cover.
Two flat roof areas were converted to low pitch metal tiled roofs. All flat roof skylights were replaced to include internal joinery works and decoration.