Follow Us:

https://supergroupcreative.co.uk/topcon/wp-content/uploads/2019/05/SAM_2158-e1559223889195.jpg

Grimsby Institute Hall

The project comprised of interal demolition/alterations to the existing main hall, complete removal of existing stage raised floor replaced with suspended floor at ground floor level and construction of a single storey extension adjacent to the hall.